DFDS Immingham: 15 Acre Resurfacing
Installed linear drainage, lighting duct routes and water supply to new constructed wash bay. Adjust existing ironworks and manholes to correct levels and grade site to required drainage falls. Install 17No. high mast lighting bases, and facilitate 58,000 m2 tarmac resurfacing and 2400m 2 concrete.
P.K. Supplied: Site Manager, Engineer, Site Supervisor, Ground Workers, Machine Drivers, Joiners
Main Sub-Contractors: Piling, Electrical, Surfacing